The church is getting a new heating and cooling system

They even told us that both of us would have to close down parts of the building to get the task done

When both of us had to shut down our church services more than 6 months ago, both of us never really dreamed that it was going to be so long before we got to meet together again. The building that we were in shut down totally because of the virus, and so it’s been a really long time since both of us have all been together. It’s been hard, but one fantastic thing that has come out of it has been the fact that both of us had time to have the HVAC method in the church completely overhauled by our commercial HVAC supplier, and we meet in a really large building and both of us have to have numerous commercial heating and cooling units to supply the auditorium, the offices, and the classrooms. Before both of us stopped meeting there earlier this year, we knew that we were going to have to get the entire HVAC method updated. There were always problems coming up with the heating system and the central A/C. The commercial HVAC supplier that we contract to do the labor for the church told us that it was going to be a really big, time consuming project for them. They even told us that both of us would have to close down parts of the building to get the task done. At that time, both of us freaked out because both of us didn’t want to have to close the church for any length of time whatsoever. But then since both of us had to shut down anyway, it ended up being the perfect time for us to get the HVAC method totally completed.
Radiant floor heating